- Home
- City Hall
- City Documents
- Comprehensive Plan
Comprehensive Plan
2040 Comp Plan DRAFT
The 2040 Comprehensive Plan DRAFT
Chapter 1: Introduction (rev September 2020)
Chapter 5: Transportation (rev January 2020)
Chapter 6: Water Resource Management Plan (rev September 2020)
Please note that this is a very large document, and includes the appendixes. If you have questions, please contact the Community Development Department at (763) 367-7844.
2030 Comp Plan
The City of East Bethel operates under a Comprehensive Plan that guides growth and development in the community. The plan contains information on land use, transportation, parks and open space, housing and the environment. The comprehensive planning process, under the Metropolitan Land Planning Act, requires local communities to adopt comprehensive plans that are consistent with the Metropolitan Council's 2030 Regional Development Framework and its four "metropolitan system plans" - for transportaion, aviation, wastewater treatment, and regional parks (Minn. Stat. 473.858-.859; 473.864).
The Comprehensive Plan
Leadership and Staff
Table of Contents
Summary
Chapter 1 - Introduction
Chapter 2 - Overview
Chapter 3 - Housing
Chapter 4 - Environment
Figure IV-1: Generalized Soils
Chapter 5 - Land Use
Figure V-1: Existing Land Use
Figure V-2: Future Land Use
Figure V-3: Proposed Growth Strategy
Figure V-4: Future Zoning
Chapter 6 - Parks
Figure VI-6: Trails and Open Space Concept Plan
Chapter 7 - Community
Figure VII-1A: Water System
Figure VII-2: Proposed Waste Water Treatment Plant Ultimate Sercive Area
Figure VII-3: Proposed Sanitary Sewer Phasing Plan
Figure VII-4: Proposed Trunk Sanitary Sewer
Figure VII-5: Proposed Corridor Waste Water Flowage
Figure VII-7: 2030 Residential Sewer Areas
Chapter 8 - Transportation
Figure VIII-2: Existing Conditions
Figure VIII-3: Traffic Analysis Zones
Figure VIII-4: Arterials and All Collectors and Frontage Roads
Figure VIII-5: Existing Functional Classifications
Figure VIII-7: Trunk Highway 65 Access and Intersection Controls
Figure VIII-8: Anticipated 2030 Traffic Volumes and Ultimate Funcional Classifications
Figure VIII-9: Proposed Improvement Projects
Chapter 9 - Implementation
-
For additional information about the Comprehensive Plan, please contact Stephanie Hanson at 763-367-7855.
2030 COMPREHENSIVE PLAN AMENDMENTS APPROVED 2018
City of East Bethel, Minnesota
Resolution No. 2018 - 16
Resolution adopting 2030 Comprehensive Plan Amendment to adopt a Mixed District land use category.City of East Bethel, Minnesota
Resolution No. 2018 - 17
Resolution adopting 2030 Comprehensive Plan Amendment to change the future land use designation of lot 1, block 1 of Sauter District PUD.City of East Bethel, Minnesota
Resolution No. 2018 - 21
Resolution adopting the 2030 Comprehensive Plan Amendment to add "group residential" and "residential with medical and/or assistive services" as allowed uses within the low /medium density residential, medium density residential, mixed use, and mixed district land use designations.The complete text version of the resolutions is available in the Community Development Department, City Hall, 2241 221st Ave NE, East Bethel. Monday – Friday, 8:00 am – 4:00 pm.